The day the docks go in always gets me excited for the start of another season of vacationing! It makes the resort look complete. It was balmy 55 degrees outside…..far better than Monday’s morning temperature of 19 degrees! The guys were happy that it had warmed up as the water was still a little chilly since the ice just left the lake a week ago.

Andy and Randy making sure the main dock gets done correctly.

Andy and Randy making sure the main dock gets done correctly.

The "line up" of sections floating to their destination.

The “line up” of sections floating to their destination.

Chris moving this section along.

Chris moving this section along.

Andy and Randy keep all the pieces in order. Every section and post are numbered.

Andy and Randy keep all the pieces in order. Every section and post are numbered.

John and John using the sections to transport the posts.

John and John using the sections to transport the posts.

For each section it takes 3 guys to hold it and 2 to attach it to the previous section. There's a total of 84 sections to put in.

For each section it takes 3 guys to hold it and 2 to attach it to the previous section. There’s a total of 84 sections to put in.

The last pile of sections to go in the water.

The last pile of sections to go in the water.

Beach dock being assembled.

Beach dock being assembled.

Enjoying a bowl of hot chili after all the hard work is done.

Enjoying a bowl of hot chili after all the hard work is done. Can’t forget the ladies who are hard at work too getting cabins cleaned!